PURPOSE
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2025.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a hybrid sewerage reticulation system for approximately 67 properties.
  • 1.6km of DN40 to DN160 PE pressure and gravity sewers.
  • A number of maintenance structures.
  • A number of flushing/scour points, isolation and air valves.
  • A number of road crossings and property connections.
  • Live sewer works.