Client

Yarra Valley Water

Site

Lower Plenty, Victoria

Installed

2023-24

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Alec Wood
Glenn Thompson
Rob Razzi
Steve Avramovski
John Williamson

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a gravity and pressure sewerage reticulation system for approximately 212 properties.

  • 8.9km of PE pressure sewers up to DN90 in size and 250m of PVC gravity sewer DN150 in size.

  • 2 maintenance holes, 2 maintenance shafts, 1 maintenance chamber.

  • 34 isolation valve, 32 flushing points, 1 air valve and green odour dome filter.

  • 4 gravity property connections and 208 pressure property connections (includes road crossing and non-road crossing connections).

  • Multiple live sewer works and live sewer maintenance hole modification.