Warrandyte Backlog Sewerage Scheme - Package One

 

Client

Yarra Valley Water

Site

Warrandyte, Victoria

Installed

2012-2014

Melbourne Pipelines Team

Lou Razzi
Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
Steve Tsotsos

PURPOSE
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water have developed a strategic objective of completing their sewerage backlog program by 2025.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a hybrid sewerage reticulation system for approximately 285 properties.
  • 8.2km of PE pressure sewers up to DN63 in size.
  • 5.7km of PVC/PE gravity sewers (up to DN150 in size and 5m deep).
  • 100 maintenance structures.
  • Flushing/scour points, isolation and air valves.
  • Road crossings and property connections.
  • Live sewer works.